Wensum Solar LLP owns a 1.9MW ground mounted installation. The plant is built adjacent to the Briar Chemicals processing facility. Almost all of the power generated by the plant is sold to the facility. The plant also benefits from subsidy income under the Renewables Obligation Certificate scheme.
The plant is maintained by RenEnergy, the developer and construction party with asset management provided in-house by Downing.




Downing LLP does not provide advice or make personal recommendations and investors are strongly urged to seek independent advice before investing. Investments offered on this website carry a higher risk than many other types of investment and prospective investors should be aware that capital is at risk and the value of their investment may go down as well as up. Any investment should only be made on the basis of the relevant product literature and your attention is drawn to the risk, fees and taxation factors contained therein. Tax treatment depends on individual circumstances of each investor and may be subject to change in the future. Past performance is not a reliable indicator of future performance. Downing LLP is authorised and regulated by the Financial Conduct Authority (Firm Reference Number 545025). Registered in England No. OC341575. Registered Office: Downing, 10 Lower Thames Street, London, EC3R 6AF.