Tilling Energy Limited owns a ground mounted solar system of 500 kW. The system was developed by Ethical Power Limited, an entity well known to Downing and with whom we have worked with on other assets in the portfolio. Located on a farm in Devon, the system has a 25-year lease in place.
The asset was commissioned in March 2014 and accredited for 1.6 ROCs. Alongside this subsidy-backed revenue stream, the ground mounted asset benefits from a PPA export arrangement.
Ethical Power Limited, the original EPC contractor, has provide O&M services to the asset since inception. The asset management function has been handled by Downing’s dedicated internal team.




Downing LLP does not provide advice or make personal recommendations and investors are strongly urged to seek independent advice before investing. Investments offered on this website carry a higher risk than many other types of investment and prospective investors should be aware that capital is at risk and the value of their investment may go down as well as up. Any investment should only be made on the basis of the relevant product literature and your attention is drawn to the risk, fees and taxation factors contained therein. Tax treatment depends on individual circumstances of each investor and may be subject to change in the future. Past performance is not a reliable indicator of future performance. Downing LLP is authorised and regulated by the Financial Conduct Authority (Firm Reference Number 545025). Registered in England No. OC341575. Registered Office: Downing, 10 Lower Thames Street, London, EC3R 6AF.